Ryan Hanley have completed the AA screening Report for the site investigation works to be undertaken in January 2022 – the final report is available under the link below.
Lifford FRS AA Screening Report for SI Works
Lifford FRS_AA Screening Determination_SI Works
Ryan Hanley are currently undertaking a Constraints Study – the final report is available under the link below.
Lifford FRS Constraints Study Report
2519 Lifford FRS Constraints Study Report V3
Appendix A
A2 2519 Public Consultation Brouchure
A3 20_52 Lifford Flood Relief Scheme
Appendix B
Appendix C
Appendix D
D2 Existing Groundwater Abstraction within Strabane
D4 Surface Water Data
Appendix E
Appendix F
Appendix G
Appendix G Air Quality Standards
Appendix H
H1 2519 Public Consultation Brouchure
H3.1 2519 Public Consultation Poster No.1 (Map)
H3.2 2519 Public Consultation Poster No.2 (Constraints Study)
H3.3 2519 Public Consultation Poster No.3 (Public Involvement)
H3.4 2519 Public Consultation Poster No.4 (Scheme Objectives & Overview)
H3.5 2519 Public Consultation Poster No. 5 (Environmental Constraints)
H3.6 2519 Public Consultation Poster No.6 (CFRMP FRS_Interaction Process Lifford)